Saturday, October 22, 2011

The House: 10.22.11

They have already started the framing! My friend at work boyfriend does framing and says this shouldn't take more then two weeks if that.

The builders still don't have the pricing for the wires or an eta on when the whole house will be finished. They say sometime in December but Banker Man needs 45 to 60 days to do the closing paperwork and we are currently 57 days from December 19th which would be the last week the workers would work until maybe January 4th due to the holidays. We also need to let landlords know. So hopefully we will get the answers to those questions soon. We would hate to delay the house being done because they cant/wont get us the pricing for the wire upgrade for us to make a decision and I would hate to have the paperwork messed up because the builders didnt let us know when the house should be finished. I don't know that many people who can be told a week before that the house will be done and get everything in order in that same week.

Anyway on to the pictures (again left is the electrical socket side, right is the fire hydrant side):

Center View

Diagonal view from left

Diagonal view from right, Brian and Gary sneaked into the picture

Center back view

Right hand side yard

Left side yard

Backyard, much larger then we thought it was going to be

Diagonally from back left

Diagonal view from back right

Different view of back yard

View of the entrance from the "will be" screened in back porch

Side ways view of the kitchen

Garage

Looking out the front door

Half bath and utility room??

Sideways master bedroom

The electrical box they did in fact have to move

Master bath and walk in closet

Second floor

The house looks and feels so tiny when it is just framing. We figure its just because the walls aren't up and the view of the outside is making it look smaller. Very disconcerting though when you walk in and feel like there is NO space whatsoever.

No comments: