The builders still don't have the pricing for the wires or an eta on when the whole house will be finished. They say sometime in December but Banker Man needs 45 to 60 days to do the closing paperwork and we are currently 57 days from December 19th which would be the last week the workers would work until maybe January 4th due to the holidays. We also need to let landlords know. So hopefully we will get the answers to those questions soon. We would hate to delay the house being done because they cant/wont get us the pricing for the wire upgrade for us to make a decision and I would hate to have the paperwork messed up because the builders didnt let us know when the house should be finished. I don't know that many people who can be told a week before that the house will be done and get everything in order in that same week.
Anyway on to the pictures (again left is the electrical socket side, right is the fire hydrant side):
Center View |
Diagonal view from left |
Diagonal view from right, Brian and Gary sneaked into the picture |
Center back view |
Right hand side yard |
Left side yard |
Backyard, much larger then we thought it was going to be |
Diagonally from back left |
Diagonal view from back right |
Different view of back yard |
View of the entrance from the "will be" screened in back porch |
Side ways view of the kitchen |
Garage |
Looking out the front door |
Half bath and utility room?? |
Sideways master bedroom |
The electrical box they did in fact have to move |
Master bath and walk in closet |
Second floor |
The house looks and feels so tiny when it is just framing. We figure its just because the walls aren't up and the view of the outside is making it look smaller. Very disconcerting though when you walk in and feel like there is NO space whatsoever.